  Completed Work
     
List of Work Completed for the Period From 2007 to 2021
     
S.No. PROJECT & LOCATION NAME AND ADDRESS OF OWNER PERIOD VALUE IN LACS (RS.) NATURE OF WORK DONE
FROM TO
1 DEVELOPMENT CONSTRUCTION OF BUILDING WORK AT ARANAYA NAGAR INDORE MINISTRY OF COMMUNICATIONS DEPARTMENT OF POST BHOPAL (M.P.) 6/6/2019 1/31/2021 125.00 CONSTRUCTION OF POST OFFICE BUILDING
2 DEVELOPMENT WORKS AT SHRI PITAMBARA PEETH CAMPUS, DATIA SHRI PITAMBARA PEETH TRUST, WARD NO. 17 HOTI PURA DIST.- DATIA (M.P.) 6/1/2018 1/31/2021 595.00 RCC FRAME STRUCTURE & ALL OTHER FINISHES FOR CONSTRUCTION OF PATHWAYS, GUEST HOUSE, U.G./O.H. WATER TANK, PRASHAD GRAH, DHYAN KENDRA, STAFF QUARTES AND MAIN GATE
3 CONSTRUCTION OF RCC RETAINING WALL & BOUNDARY WALL AT BICHOLI HABSI, INDORE BY PASS-ROAD INDORE PREM MOTORS INDIA LLP NEAR PHOOL BAGH CROSSING MLB ROAD, GWALIOR - 474002 7/15/2018 2/28/2020 388.00 COUNTERFORT RCC RETAINING WALL 2.60M ABOVE GROUND LEVEL AND ABOVE THAT 3.00M HIGH BOUNDARY WALL
4 CONSTRUCTION OF ROAD & LAND DEVELOPMENT, AT VILLAGE BINJANA DIST. DEWAS AVANTEE MEGA FOOD PARK PVT. LTD., 503, MAHAKOSH HOUSE, 7/5, SOUTH TUKOGANJ, INDORE (M.P.) 4/12/2016 7/21/2020 857.00 CONSTRUCTION OF ROAD & LAND DEVELOPMENT (55 ACRE LAND)
4/12/2016 11/2/2018 135.00 CONSTRUCTION OF BOUNDARY WALL, ( 55 ACRE LAND)
4/26/2016 8/20/2019 340.00 CONSTRUCTION OF FACTORY BUILDING CIVIL WORK& DRIVE WAYS AT CPC AND FOUR PPC,
5 CONSTRUCTION OF 48 NO. AFFORDABLE HOUSES (EWS) AT SCH. NO. 135 OF INDORE DEVELOPMENT AUTHORITY INDORE DEVELOPMENT AUTHORITY 12/15/2015 12/31/2017 163.77 CONSTRUCTION OF 48 NO. AFFORDABLE HOUSES (EWS)
6 CONSTRUCTION OF COLD STORAGE AT UJJAIN DIST.INDORE M/s GIRNAR COLD STORE PVT.LTD MANPUR, DIST.INDORE 5/1/2016 2/28/2017 226.35 CONSTRUCTION OF COLD STORAGE
7 CONSTRUCTION OF RCC TREMIX FLOORING WORK INFINITY INTERIORS PVT. LTD., 1-A, FIRST FLOOR, VIMAL UDYOG BHAVAN TALKAWADI RD. MATUNGA(W) MUMABI 1/1/2017 8/31/2017 76.00 CONSTRUCTION OF RCC TREMIX FLOORING IN BASEMENT, BROOM FINISHING
8 STRUCTURE WORK OF EWS AT SBD DEVELOPERS GRAM BHAWARSLA, UJJAIN ROAD, INDORE SHRI ARUN DUBEY, SBD DEVELOPERS, GRAM-BHAWARSIA, UJJAIN ROAD INDORE. 3/10/2016 12/31/2016 151.01 CONSTRUCTION OF STRUCTURE WORK OF EWS
9 CONSTRUCTION OF COLD STORAGE AT MANPUR DIST.INDORE M/s GIRNAR COLD STORE PVT.LTD MANPUR, DIST.INDORE 4/11/2015 5/6/2016 71.77 CONSTRUCTION FOR EXTENTION OF COLD STORAGE INCLUDING VERANDA, STAIR CASE & LIFT TOWER.
10 CONSTRUCTION OF LIBRARY BUILDING (26000 SFT) & STAFF QUARTER (34000 SFT) FOR SEWALKUNJ HOSPITAL & RESEARCH CENTER AT GRAM KANADIYA, INDORE. DR. RAMESH BADLANIJI, CHAIRMAN, SHRI ASTHA FOUNDATION FOR EDUCATION SOCIETY, INDORE 5/12/2014 2/15/2016 664.39 APPROX 106000 SFT BUILDING WORK INCLUDING ALL FINISHING, WATER SUPPLY, SANITARY & ELECTRICAL WORK.
11 CONSTRUCTION OF STRUCTURE, BRICK WALL & AND PLASTER OF HOTEL BUILDING FOR CRESENT RESORTS & SPA LTD. NEAR DEVGURADIA TEMPLE , INDORE SHRI AKHILESH RAI (CHAIRMAN-9826052616) & DHAVAL PANCHASARA (ARCHITECT-9825346234 ) CRESENT GROUP, SEHORE 9/1/2013 8/31/2014 1,071.00 COMPLETE STRUCTURE, BRICK WALL & PLASTER WORK OF APPROX 150081 SFT (G+3 FLOOR) HOTEL BUILDING.
12 DEVELOPMENT WORK OF BRAJDHAM IN FRONT OF ARBINDO HOSPITAL, SANWER ROAD, INDORE SHRI ARUN DUBEY, SBD DEVELOPERS, GRAM-BHAWARSIA, UJJAIN ROAD INDORE. 4/1/2014 8/30/2015 499.47 CONSTRUCTION OF CONCRETE ROAD INCLUDING BASE WORK, HUME PIPE LAYING, MAIN GATE & CATTLE TRAP WORK
13 DEVELOPMENT WORK FOR PINNACLE D DREMS E AT NIPANIYA, INDORE JSM DEVCONS INDIA P.LTD. 306 ORBIT MALL SCHEM NO.54 AB ROAD INDORE 12/1/2013 4/30/2015 300.00 RCC ROAD WORK 2 NOS STP TANK & BOUNDARY WALL WORK
14 DEVELOPMENT WORK OF LAND NEAR KHAJRANA GAESH TEMPLE PREMISES, INDORE INDORE DEVELOPMENT AUTHORITY, INDORE 10/15/2013 10/15/2014 170.00 CONSTRUCTION OF CONCRETE ROAD & PAVERS, LAYING OF SEWERAGE, STORM & WATER PIPE LINE, NEAR SHRI GANESH TEMPLE, KHAJRANA, WARD NO.40, INDORE (
15 CONSTRUCTION OF FACTORY SHED OF SWARAJ METAL SECTION AT PITHAMPUR, SECTOR- III. SHRI ANIL TURAKHIIA, (MANAGING DIRECTOR)M/S SWARAJ METALS, FIRST STREET NO 46, LOHA MANDI INDORE 6/15/2013 5/30/2014 324.00 CONSTRUCTION OF 25000 SFT PEB SHED, ROAD, 2-LAC LITRE UG WATER TANK, BOUNDARY WALL ETC.
16 CONSTRUCTION OF STRUCTURE AND CIVIL WORK OF 4th FLOOR OF CHAMELI DEVI PUBLIC SCHOOL KESHAR BAG, INDORE SHRI PRASHANT AGARWAL( DIRECTOR) AGARWAL GROUP AT INDORE 5/15/2013 10/30/2013 131.00 APPROX 27000 SFT STRUCTURE, BRICK WALL & PLASTER WORK OF SCHOOL BUILDING AT FOURTH FLOOR
17 CONSTRUCTION OF STRUCTURAL AND CIVIL WORK OF BOUNDARY WALL OF PINNACLE D DESIRE AT SUPER CORRIDOR, PALA KHEDI, INDORE JSM DEVCONS INDIA P.LTD. 306 ORBIT MALL SCHEM NO.54 AB ROAD INDORE 1/1/2012 6/30/2013 182.00 APPROX 3.00 K.M. BRICK COMPOUND WALL.
18 CONSTRUCTION OF PLANT & BUILDING OF IMA-PG INDIA PVT.LTD. AT R.VILLAGE LIMBODIGARI, INDORE-UJJAIN ROAD, INDORE M/s IMA-PG INDIA PVT.LTD., PLOT NO.R-677. T.T.C. Ind.AREA MIDCRABLE,NAVI MUMBAI 6/1/2012 4/30/2013 829.00 APPROX 50000 Sft.FACTORY BUILDING WITH EXPOSED ROOF SLAB USING PLY SHUTTRING INCLUDING ALL FINISHING JOB, ROAD WORK & COMPOUND WALL.
19 CONSTRUCTION OF SOYABEEN OIL PLANT FOR SITA SHREE FOOD PRODUCTS LTD. AT BARLAI, (SHIPRA), INDORE SHRI DINESH AGRAWALJI, CHAIRMAN, M/s SITA SHREE FOOD PRODUCTS LTD. PALADA, INDORE 12/1/2010 2/28/2013 750.00 PREPARATORY, DOC GODOWN SEP, BARDANA GODOWN CANTEEN SILOS, DAYBIN, PRE-CLEANING SHED, BOILER HOUSE OFFICE BUILDING, ROAD, BOUNDARY WALL, ETP ETC.
20 CONSTRUCTION OF NEW WARE HOUSE/ BODI PLANT FOR RUCHI SOYA INDUSTRIES LTD.MANGILIA , INDORE. RUCHI SOYA INDUSTRIES LTD. MAHAKOSH HOUSE, SOUTH TUKOGANJ, INDORE 10/1/2010 2/24/2012 625.00 APPROX 1,20,000 Sft.-3 STORIES PEB SHED ON DECK SLAB
21 CONSTRUCTION OF HOTEL BUILDING OF V.S. ENTERTAINMENT AT R.N.T.MARG, NEAR HOTEL PRESIDENT, INDORE Mr. NITESH WADHWANI , M/s V.S.ENTERTAINMENT ,64 B PREM NAGAR, MANIK BAUG, INDORE 3/1/2011 12/31/2011 140.00 APPROX 34,000 Sft.BUILDING WORK (BASEMENT + G.F.+ FOUR FLOOR) STRUECTURE BRICK WORK, PLASTER & WATER PROOFING WORK EXCLUDING FINISHES.
22 CONSTRUCTION OF FACTORY SHED, OFFICE BUILDING FOR METHODEX SYSTEMS PVT.LTD.INDORE SHRI KALPK GANDHIJI M/S METHODEX SYSTEMS LTD. PITHAMPUR, SEC.-III 11/4/2009 2/28/2011 551.19 APPROX 1,20,000Sft P.E.B. SHED, 13,500 Sft. OFFICE BUILDING, , ROAD, BOUNDARY WALL.& DEVELOPMENT/ WORK OF ENTIRE PREMISES.
23 CONSTRUCTION OF FACTORY SHED & RELATED WORK FOR CEBBCO AT PITHAMPUR, SECTOR- III. SHRI AJAY GUPTA, COMMERCIAL ENGINEERS & BODY BUILDERS COM.P.LTD. ( CEBBCO), A DIVI.OF J.N.GROUP OF COMPANIES, 21,22,33,34, INDUSTRIAL AREA RICHHAI, JABALPUR- 482010 M.P. 5/5/2010 11/30/2010 200.00 CONSTRUCTION OF 30,000 Sft. PEB SHED OFFICE TOILET BLOCK, ROAD & RELATED WORK.
24 CONSTRUCTION OF RESIDENCE OF SHRI KANSALIWALJI (S.KUMAR'S GROUP) AT NEERJA VILLA, A.B. ROAD, INDORE M/s K.U.ENTERPRISES 4, CHHOTI KHAJARANI, A.B.ROAD, INDORE 9/22/2009 1/31/2010 140.00 APPROX 12,000 Sft BUILDING WORK , ROAD, BOUNDARY WALL & MISCELLANOUS OTHER WORK.
25 CONSTRUCTION OF RETAIL CENTERE FOR RUCHI INFRASTRUCTURE LTD. AT BETUL RUCHI INFRASTRUCTURE LTD.( RUCHI GROUP), INDORE 6/1/2009 1/30/2010 170.00 CONSTRUCTION OF 60,000Sft P.E.B. WARE HOUSE, 4,000 Sft MALL BUILDING, SITE DEVELOPMENT, ROAD & BOUNDARY WALL.
26 CONSTRUCTION OF RESIDENCE CUM HOSTEL BUILDING AT SANWER ROAD, INDORE SHRI HEMENT SHUKLAJI 34, SHAKEMBARI AVENUE VILLAGE REWATI, TAHSIL SANWER, DIST INDORE 6/30/2009 12/30/2009 35.00 APPROX 7,000 Sft BUILDING WORK
27 CONSTRUCTION OF FACTORY SHED FOR PRAGATI GRAPHICS PVT.LTD. AT RANGVASA INDUSTRIAL AREA, INDORE M/s PRAGATI GRAPHICS PVT.LTD. JANRUCHI PARISAR 43/3, KESAR BAG ROAD, INDORE 4/20/2009 7/22/2009 140.00 25,000 Sft P.E.B. SHED, ROAD & MISCELLENEOUS WORK
28 CONSTRUCTION OF INDORE INDIRA COLLEGE OF MANAGEMENT STUDIES AT SANWER ROAD, INDORE Mr.SWAPNIL KOTHARI, M.D., KAUTILYA CHANDRA GUPTA SOCIETS, ANURAG NAGAR, BEHIND PRESS COMPLEX, INDORE. 11/15/2007 1/15/2009 675.00 CONSTRUCTION OF 75000Sft COLLEGE BUILDING, SWIMMING POOL, CANTEEN, SPORTS COMPLEX, SECURITY & MAIN GATE, EXTERNAL DEVELOPMENT, ROAD WORK & BOUNDARY WALL INCL. INTERNAL & EXTERNAL ELECTRICATION WORK